Construction method

SNTZ-100 Air gel Thermal Insulation Thick Intermediate Coating Construction Precautions

2024-05-29
Before construction:1. This product needs to be thoroughly stirred for no less than 3 minutes before use, and a small amount of water can be added depending on the situation, but not more than 5%.2...

Precautions for SNTZ-101 Air gel Thermal Insulation Surface Coating Construction

2024-05-29
Before construction:1. Add 5% -20% distilled water and stir evenly before applying. This product can be applied by brushing, wiping, rolling, high-pressure airless spraying, or combined with other ...

Precautions for construction of SNTG series industrial aerogel thermal insulation coating

2024-05-29
Before construction:1. Open the bucket for mixing: The mixing time should be at least 3 minutes.2. The air gel thermal insulation coating can be applied by spraying or plastering. The total thickne...