SNTG-180 aerogel nano thermal insulation coatingfor industrial use is a new type of nano thermal insulation material.The main active ingredient is a variety ofinorganic fibers, nano silica aerogel filler and other materials as the mainbody, water as the dispersion medium, adding special binders, fiber loosening,stirring and made of viscous slurry.It can be directly covered on the surface of the protected metal or othermaterials by spraying or plastering, and cured at room temperature or lowtemperature to form a protective layer with efficient thermal insulationeffect.The product has the characteristics of low thermalconductivity, high bond strength, short drying time, low shrinkage, and is noteasy to crack after drying. It is the best choice for insulation of equipment,storage tanks, and special shapes and complex working conditions.
The coatingcan withstand a maximum temperature of 180°C, and is used in various medium andlow temperature equipment, industrial kiln surfaces, metallurgical and refiningequipment, etc


1. Superior thermalinsulation performance, which can effectively prevent heat transfer;
2. No asbestos, nocarcinogenic substances and other harmful substances;
3. Strong adhesion, can be firmly attached to the surface of the object;
4. Spraying with high-pressure airless spraying machine or portablewatering can, convenient construction;
Packing:20L/drum
Construction method:Spraying/batch coating
Theoretical coating consumption: 0.8kg/㎡/mm (the actual coating consumption is related tothe flatness of the substrate and construction control).
1. Before thecoating precursor is applied, the rust, oil, dust and other debris on thesurface of the coating should be cleaned up;
2. Theconstruction temperature shall not be lower than 5 °C, and the air humidityshall not exceed 85%, and the construction shall not be suitable before andafter fog and humidity and rainfall;
3. After thelid of this product is opened, it needs to be stirred evenly before it can beused, and pure water with a weight of no more than 5% can be added for dilutionaccording to different construction methods;
4. The intervalbetween the construction of each coating should be more than 24 hours (when theconstruction is in a cold or humid climate, the interval time should beappropriately extended);
5. The latterprocess can only be carried out after sufficient drying, and the constructiongenerally needs to be maintained for 3 days after completion (specificallyrelated to the thickness of the construction and the weather);
6. This productis a new material product, please call for consultation for specificconstruction and supporting schemes.
Packaging, Storage & Transportation:
This product should be stored in a cool and dryplace at 5~35°C, not exposed to the sun, and the effective storage period is 12months;
This product is non-flammable and non-explosive,and can be transported according to general materials, avoiding exposure to thesun, collision, heavy pressure during transportation, and keeping the packagingintact.