HOME
/
PRODUCTS
Aerogel coatings for industrial use
Aerogel coatings for construction
Aerogel felt for heat preservation
Aerogel felt for cold insulation
/
APPLICATION
Building insulation
Petrochemical industry
Power plant heating network
Steel smelting
Cryogenic insulation
Industrial equipment
Electronic appliances
New energy
/
CASE
/
TECHNICAL SUPPORT
Common problem
Construction method
/
ABOUT US
/
CONTACT US
Chinese
English
SNTZ-100 Air gel Thermal Insulation Thick Intermediate Coating Construction Precautions
2024-05-29
Before construction:1. This product needs to be thoroughly stirred for no less than 3 minutes before use, and a small amount of water can be added depending on the situation, but not more than 5%.2...
Construction method
Precautions for SNTZ-101 Air gel Thermal Insulation Surface Coating Construction
2024-05-29
Before construction:1. Add 5% -20% distilled water and stir evenly before applying. This product can be applied by brushing, wiping, rolling, high-pressure airless spraying, or combined with other ...
Construction method
Precautions for construction of SNTG series industrial aerogel thermal insulation coating
2024-05-29
Before construction:1. Open the bucket for mixing: The mixing time should be at least 3 minutes.2. The air gel thermal insulation coating can be applied by spraying or plastering. The total thickne...
Construction method
PRODUCTS
APPLICATION
TECHNICAL SUPPORT
NEWS
phone
:
+86
13612766112
phone
:
+86
19120322649
E-mail
:
sanataerogel@gmail.com
WhatsApp
Miss Yang Mr. Dong