广东赛纳特节能有限公司 广东赛纳特节能有限公司

  • HOME
  • /
  • PRODUCTS
    • Aerogel coatings for industrial use
    • Aerogel coatings for construction
    • Aerogel felt for heat preservation
    • Aerogel felt for cold insulation
  • /
  • APPLICATION
    • Building insulation
    • Petrochemical industry
    • Power plant heating network
    • Steel smelting
    • Cryogenic insulation
    • Industrial equipment
    • Electronic appliances
    • New energy
  • /
  • CASE
  • /
  • TECHNICAL SUPPORT
    • Common problem
    • Construction method
  • /
  • ABOUT US
  • /
  • CONTACT US
  • Chinese
  • English

SNTZ-100 Air gel Thermal Insulation Thick Intermediate Coating Construction Precautions

2024-05-29
Before construction:1. This product needs to be thoroughly stirred for no less than 3 minutes before use, and a small amount of water can be added depending on the situation, but not more than 5%.2...
Construction method

Precautions for SNTZ-101 Air gel Thermal Insulation Surface Coating Construction

2024-05-29
Before construction:1. Add 5% -20% distilled water and stir evenly before applying. This product can be applied by brushing, wiping, rolling, high-pressure airless spraying, or combined with other ...
Construction method

Precautions for construction of SNTG series industrial aerogel thermal insulation coating

2024-05-29
Before construction:1. Open the bucket for mixing: The mixing time should be at least 3 minutes.2. The air gel thermal insulation coating can be applied by spraying or plastering. The total thickne...
Construction method

PRODUCTS


APPLICATION

TECHNICAL SUPPORT


NEWS

phone:+86 13612766112
phone:+86 19120322649
E-mail:sanataerogel@gmail.com

                      WhatsApp

    Miss Yang                    Mr. Dong

   佳灵.jpg    董晨.jpg




SANAT Aerogel Insulation LTD,Guangdong,CN copyright

Login粤ICP备2024260214号